New Construction Specifications
This guide, and all linked material, should be read in its entirety to help minimize problems associated with service connections. The following short list is a summary of the major steps suggested:
- Apply for service, and request a survey meeting with a Sumter EMC representative.
- Meet on-site with the Sumter EMC representative to discuss details of the project, especially the location of the service entrance equipment.
- Based on your meeting with the Sumter EMC representative, tell the electrician where the service entrance equipment needs to be installed.
- Notify Sumter EMC at least 2 weeks in advance to allow time for service construction.
- When construction is nearing completion, arrange an inspection (if required) with the local governmental authority.
This guide is a summary of the general requirements for membership and service. Sumter EMC's Articles of Incorporation, bylaws, service rules and regulations, rate schedules, and requirements set forth in the National Electrical Code and National Electrical Safety Code shall prevail in the event of a conflict with information provided herein.
Contact Sumter EMC Before Starting Any Construction!
Sumter EMC is a member-owned non-profit corporation. Our employees work hard to protect the interests of members. Sumter EMC representatives will discuss your construction plans with electricians and other contractors to help minimize costs associated with service connections. Communication between electricians and the Cooperative is vitally important to minimize expense to the member. Failure to properly plan the location of service equipment can cause costly changes in construction. The Surveys link below outlines some of the issues to be considered.